生陽極塊經(jīng)板式輸送機(jī)送入焙燒車間,經(jīng)碳?jí)K編組站編為7塊一組,置于專用的編組架上,產(chǎn)品裝爐時(shí)由多功能機(jī)組一次夾2組碳?jí)K(共14塊)裝入焙燒爐。填充料的裝、出爐操作,采用1臺(tái)多功能機(jī)組和1臺(tái)填充料專用裝出爐機(jī)組共同完成。生陽極的焙燒采用一臺(tái)54室敞開式焙燒爐,共設(shè)3個(gè)火焰系統(tǒng),每個(gè)火焰系統(tǒng)6室運(yùn)轉(zhuǎn),焙燒曲線為26~30h/室,每個(gè)爐室8個(gè)爐箱,爐箱尺寸5300mm(長)×800mm(寬)×5600mm(深),每箱裝3層,每層裝7塊,每個(gè)爐室裝168塊。焙燒爐用焦?fàn)t煤氣作為燃料。按編制的時(shí)間表,將裝好生陽極炭塊的焙燒爐室接入加熱系統(tǒng),加熱系統(tǒng)煙氣溫度為1200℃,整個(gè)加熱升溫過程用計(jì)算機(jī)進(jìn)行控制。經(jīng)156~180小時(shí)完成加熱焙燒后切斷熱源脫離加熱系統(tǒng),對爐室進(jìn)行強(qiáng)制冷卻,冷卻到規(guī)定的時(shí)間后出爐。
生陽極炭塊裝入焙燒室時(shí),需要在炭塊四周和頂部填充焦粉,以防止炭塊在高溫焙燒時(shí)接觸空氣氧化。加熱系統(tǒng)的火道采用負(fù)壓運(yùn)行,部分填充焦粉、生陽極炭塊高溫焙燒過程原料瀝青中的揮發(fā)份等從焙燒室縫隙吸入火道被燃燒。
陽極焙燒分4個(gè)區(qū),工作區(qū)-冷卻區(qū)-加熱區(qū)-預(yù)熱區(qū)。6個(gè)室一周轉(zhuǎn)。工作區(qū)為1個(gè)室,冷卻區(qū)為1個(gè)室,加熱區(qū)為1個(gè)室,預(yù)熱區(qū)為3個(gè)室。工作區(qū)為裝、出陽極區(qū),冷卻在冷卻區(qū)由鼓風(fēng)機(jī)強(qiáng)制通風(fēng)冷卻,風(fēng)在冷卻陽極的同時(shí),自身也得到預(yù)熱,熱風(fēng)作為加熱區(qū)的一次空氣助燃,燃燒后的廢氣進(jìn)入預(yù)熱區(qū)預(yù)熱陽極。
焙燒陽極出爐時(shí),首先用填充料裝出爐機(jī)組去除覆蓋在陽極上的填充料,然后用多功能機(jī)組將兩個(gè)爐箱內(nèi)的陽極(共14塊)一次吊出送到清理站解組并清理,由陽極清理機(jī)組的機(jī)械刮刀機(jī)械清理,同時(shí)抽風(fēng)吸塵。經(jīng)清理及測試后合格的陽極炭塊送到碳?jí)K庫由堆垛天車堆垛貯存,外售。
在焙燒過程中,從焙燒爐排出的含有瀝青焦油及粉塵的焙燒煙氣進(jìn)入凈化系統(tǒng)處理。
The green anode block is sent to the roasting workshop by the plate conveyor, and is grouped into 7 blocks by the carbon block marshalling station, and placed on a special marshalling rack. When the product is installed in the furnace, the multifunctional unit clamps 2 sets of carbon blocks at a time (14 blocks in total) ) Put it into the roasting furnace. The filling and discharging operation of the filling material is jointly completed by a multi-function unit and a special filling and discharging unit. A 54-chamber open roasting furnace is used for the roasting of the green anode. There are 3 flame systems in total, each of which operates in 6 chambers. The roasting curve is 26-30h/chamber, and each furnace chamber has 8 furnace boxes. The size of the furnace box 5300mm(length)×800mm(width)×5600mm(depth), 3 layers per box, 7 pieces per layer, and 168 pieces per furnace. The roaster uses coke oven gas as fuel. According to the compiled timetable, the roasting furnace chamber with the raw anode carbon block is connected to the heating system. The flue gas temperature of the heating system is 1200 ℃, and the entire heating process is controlled by a computer. After 156 to 180 hours of heating and roasting, the heat source is cut off and separated from the heating system, the furnace chamber is forced to cool, and the furnace is cooled to a specified time and then out of the furnace.
When the raw anode carbon block is loaded into the roasting chamber, it is necessary to fill coke powder around and on the top of the carbon block to prevent the carbon block from being oxidized by air during high-temperature roasting. The fire channel of the heating system is operated under negative pressure, partially filled with coke powder and volatile matter in the raw material pitch of the raw anode carbon block high-temperature roasting process, sucked into the fire channel from the gap of the roasting chamber and burned.
Anode baking is divided into 4 zones, working zone-cooling zone-heating zone-preheating zone. 6 rooms turn around. The working area is 1 room, the cooling area is 1 room, the heating area is 1 room, and the preheating area is 3 rooms. The working area is the anode loading and exiting area. The cooling area is cooled by forced ventilation by a blower. The wind cools the anode while preheating itself. The hot air serves as the primary air in the heating area to assist combustion, and the burned exhaust gas enters the preheating area for preheating. Hot anode.
When the roasted anode is out of the furnace, first use the filling material to remove the filling material covering the anode, and then use the multifunctional unit to lift the anodes in the two furnace boxes (a total of 14 blocks) to the cleaning station for disassembly and cleaning , It is mechanically cleaned by the mechanical scraper of the anode cleaning unit, and at the same time, it is vacuumed and dusted. After cleaning and testing, the qualified anode carbon blocks are sent to the carbon block warehouse for storage by stacking cranes and sold outside.
In the roasting process, the roasting flue gas containing pitch tar and dust discharged from the roasting furnace enters the purification system for treatment.
掃二維碼用手機(jī)看
聯(lián)系我們
營銷專線:18253370932(微信同號(hào))
電話:0546-6215187 / 0546-6215188
人力資源:0546-6215181
傳真:0546-6215188
地址:山東省東營市利津縣明集鄉(xiāng)山東中小企業(yè)創(chuàng)業(yè)園規(guī)劃利沾路以東,規(guī)劃創(chuàng)業(yè)大道以北

掃碼立即咨詢

掃碼立即咨詢
Copyright ? 2020 利津榮達(dá)新材料有限公司 版權(quán)所有 魯ICP備2020041800號(hào) 官方網(wǎng)站建設(shè):中企動(dòng)力 淄博分公司